Deep modernization of the control system for receiving, storing and feeding of raw materials shop

What Is Implemented:
  • New shop management system
Client:
large international confectionery company
Problematics and Inquiry:
  • Existing control cabinets have exhausted the possibilities for expansion
  • Existence of obsolete and discontinued equipment
  • Tracks from existing cabinets to field devices did not allow for cable laying without stopping production
  • Overloaded cable routes

The project was complicated by the fact that the time to shut down the equipment was very limited and the customer partially lacked a documentation package for the old equipment.

Tools:
  • Rockwell Automation
Economic effects:
  • Uninterrupted operation of the site has been established
  • Simplified site maintenance
  • Cable routes were freed up and made available for the installation of new cables