Modernization of the plant's LAN

What Is Implemented:
  • Performed an audit of the current local area network
  • A new LAN topology was designed
  • Construction and installation work and commissioning have been completed
Client:
The client is an international production company producing food and animal food with 7 sites on the territory of the Russian Federation.
Problematics and Inquiry:
The company engaged ATC Basis LLC to upgrade the local area network at 1 plant. The network has more than 2000 end devices. Among the main difficulties of the project were the lack of LAN topology at the client and the use of obsolete equipment. The project was carried out in a continuous production environment, the implementation took 2 years.
Tools:
  • Cisco
Economic effects:
  • The payback period of the project was 2 years